Most teams have a Timesheet tab full of logged hours and no one who has actually looked at them. Time gets logged, a report gets pulled at the end of the sprint or before an invoice goes out, and everyone just trusts that it's right — until it isn't, and there's no record of anyone having checked.
Worklog Approvals adds the missing step: a manager explicitly reviews and signs off on what was logged, before it becomes an invoice line or a sprint metric. Here's how to set it up and run your first review.
Before You Start: Requirements
Worklog Approvals is a TimeEase Advanced feature. If you're on the Advanced edition, you're already set — every Jira admin has access to the tab by default. If you're on Free or Standard, you'll need to upgrade first.
Not every reviewer needs to be a Jira admin: from the tab's Manage access button, an admin can add specific people to the reviewer list. That list is shared with the Capacity settings in Settings → Rates & Capacity — add someone once and they can both set capacity baselines and review worklogs.
Step 1: Set Weekly Capacity Baselines
Everything starts in Settings → Rates & Capacity. Click the Capacity cell next to a teammate's name and enter their expected hours per week — 40, 32, whatever their normal week looks like. This is a one-time setup per person, not something you touch every review cycle.
It's optional per user — skip anyone you don't want to track this way, and their approvals still work fine, just without the Planned/Remaining/Utilisation comparison.
⚠️ Current limitation: capacity today is a flat weekly number. It doesn't yet account for holidays, PTO, or part-time weeks — if someone's out for three days, their baseline won't adjust automatically. Keep that in mind when reading Utilisation for a week with time off in it.
Step 2: Pick a Period and Apply Filters
Open the Worklog Approvals tab and choose a period — Today, Current Week, Current Month, Previous Month, Last 7 Days, or a custom range. This is the window everything else on the page is scoped to.
Filters matter here more than they might seem to: narrow by Project, User, Group, Label, or Custom Field to scope a review to exactly the team or engagement you're signing off on — a specific client's project before their invoice goes out, or one squad before a sprint retro. Reviewing everyone, always, tends to turn into reviewing no one, carefully.
Step 3: Read the Roster
Each row shows one teammate with six columns: Capacity, Planned, Logged, Remaining, Utilisation, and Status. Planned scales the weekly baseline to whatever period you picked — a 40h/week baseline over a 3-day range plans roughly 17h, not 40h — so Logged and Remaining are always compared against the right number for the window you're looking at.
Utilisation renders as a meter bar and turns pale red once someone crosses 100% — visible, not alarming. Status tells you at a glance whether there's anything to do: “No worklogs,” “All approved,” or “N Pending.”
No capacity baseline set for someone? Planned, Remaining, and Utilisation just show “—” for that row — their pending/approved status still works normally. Capacity is context, never a gate.
Step 4: Review and Approve
Click a row to expand it into that person's worklog queue for the period — date, issue, time logged, comment, and status. From here you can:
- Approve a single entry once you've checked it
- Approve all to clear every pending entry for that person in one action, when everything looks right
- Cancel approval on anything you approved too quickly — it reverts straight back to pending for another look, no confirmation needed either way
If a worklog changes after you've approved it — someone edits the hours or rewrites the comment — you'll see a “Modified since approval” flag next to its status the next time you look. Approving doesn't lock anything in Jira; it's a record of what you reviewed and when, not a restriction on what anyone can still edit.
Make It a Cadence, Not a Cleanup
This works best as a habit, not an occasional catch-up. Reviewing a small, filtered slice weekly — or right before a sprint closes or an invoice goes out — takes minutes and catches a miskeyed entry while it's still fresh. Letting weeks of unreviewed worklogs pile up turns the same task into an afternoon, and by then nobody remembers what actually happened on a Tuesday three weeks ago.
Common Questions
Does approving a worklog lock it in Jira?
No. Forge apps can't restrict native Jira edits, and TimeEase doesn't pretend otherwise. Approval is a record with a timestamp and a snapshot of what was reviewed — if the worklog changes afterward, you'll see the “Modified since approval” flag.
Can I reject a worklog?
There's no permanent “rejected” status with a reason attached. Instead, use Cancel approval to send an already-approved entry back to pending — useful when you want another pass, or you'll follow up with the person directly rather than leaving a note only you would ever read.
Who can review and approve?
Jira admins, by default, plus anyone an admin adds through Manage access — the same list used for Capacity settings.
What if someone doesn't have a capacity baseline set?
Their Planned/Remaining/Utilisation columns show “—,” but their worklogs are still fully reviewable — capacity is optional context, not a requirement for approvals to work.
Already on Advanced? Set it up today
Open Settings → Rates & Capacity to set your first baseline, then head to the Worklog Approvals tab and run through the steps above. Not on Advanced yet? Upgrade from inside TimeEase, or install it free to try everything else first.
Install TimeEase Free →Available for Jira Cloud · Forge-native · Free tier available